Home page
Fleet Renewal

Fleet Renewal

FSA members are the largest investors in the construction of a new Russian fleet
>60%
of industry-wide investment
40
new vessels
Supertrawlers
Project ST-192
11
vessels
Deadweight
5,700 tons
Length
108.2 m
Breadth
21.0 m
Cargo capacity
5,500 m³
Full speed
15 knots
Sea endurance
45 days
Crew
139 people
Fillets, mince and surimi
14.9 thousand tons
Fishmeal and oil
5.7 thousand tons
Other products (roe, milt, whole herring)
8.1 thousand tons
100% recycling of fish offals
Possibility of fishing in the ice regions
Supertrawlers
Project ST-192
Heavy-tonnage processing-trawlers (factory trawlers)
Project 170701
10
vessels
Length
81.6 m
Breadth
16 m
Speed
15 knots
Displacement
5500 tons
Main engine power
6.2 MW
Freezing capacity
100 tons of final products per day
Crew
80 people
Vessels for the Northern Basin:
Cod and haddock fillets
up to 40 tons
Frozen gutted products
up to 60 tons
Production of canned cod liver and fishmeal
Vessels for the Far Eastern Basin:
Pollock fillets
up to 45 tons
Frozen gutted pollock and herring products
up to 90 tons
Production of roe, milt and pollock liver, fishmeal
100% recycling of fish offals
Possibility of fishing in the ice regions
Heavy-tonnage processing-trawlers (factory trawlers)
Project 170701
Heavy-tonnage processing-trawlers (factory trawlers)
Project KMT02
3
vessels
Length
80,4 m
Breadth
15,4 m
Speed
15 knots
Main engine power
4,6 MW
Freezing capacity
105 tons of final products per day
Crew
46 people
Heavy-tonnage processing-trawlers (factory trawlers)
Project KMT02
Medium-tonnage processing-trawlers (factory trawlers)
Project 1701
2
vessels
Length
61.04 m
Breadth
14.0 m
Displacement
3130 t
Crew
38 people
Frozen fillet
to 70 tons
Medium-tonnage processing-trawlers (factory trawlers)
Project 1701
Crab factory vessels with crab processing factory
Project 5712P
3
vessels
Length
57.70 m
Breadth
12.60 m
Sea endurance
40 days
Full speed
12.6 knots
Main engine power
1620 kW
Bow thruster power
400 kW
Crew
32 people
Processing and output of final products
15 tons
Freezing hold capacity
500 m³
Crab factory vessels with crab processing factory
Project 5712P
Crab fishing vessels for harvesting and shipping live crab
Project 5712LS
7
vessels
Length
57.70 m
Breadth
12.60 m
Sea endurance
40 days
Full speed
12.6 knots
Main engine power
1620 kW
Bow thruster power
400 kW
Crew
20–24 people
Tanks capacity for live crab transportation
640 m³
Tonnage capacity by live crab
120 tons
Crab fishing vessels for harvesting and shipping live crab
Project 5712LS
Longliners
Project 200101
4
vessels
Length
63 m
Breadth
14 m
Draft
5.9 m
Speed
14 knots
Crew
39 people
Total processing capacity on board the vessel
up to 50 tons
Freezing capacity
up to 50 t/day
Production of fillets, canned cod liver, frozen by-products
Longliners
Project 200101
Construction status
5
Factory supertrawler
Project ST-192
1
Heavy-tonnage processing-trawlers
Project KMT02
1
Crab fishing vessel
Project 5712LS
5
Heavy-tonnage processing-trawlers
Project 170701
1
Medium-tonnage processing-trawler (factory trawler)
Project 1701
1
Crab fishing vessel
Project 5712LS
3
Crab factory vessel
Project 5712P
1
Heavy-tonnage processing-trawler (factory trawler)
Project KMT02
Factory supertrawler
Project ST-192
Heavy-tonnage processing-trawlers
Project KMT02
Crab fishing vessel
Project 5712LS
Heavy-tonnage processing-trawlers
Project 170701
Medium-tonnage processing-trawler (factory trawler)
Project 1701
Crab fishing vessel
Project 5712LS
Crab factory vessel
Project 5712P
Heavy-tonnage processing-trawler (factory trawler)
Project KMT02